Menü
Materialien Maschinen
Einblicke
Artikel Videos Problem & Lösung
About
Über Chembull Medienpartner
Kontaktieren Sie uns
Sprache
EnglishالعربيةPortuguêsEspañolDeutschTürkçe한국어
Zurück zu Problem & Lösung
Processing Machinery 3 Aufrufe

ABS vent 0.025-0.05

Problembeschreibung
ABS vent depth 0.025-0.05mm, flow end and weld line, burnt prevention and control.
Ursachenanalyse
ABS vent depth 0.025-0.05mm; at the ends of all flow paths; near weld lines; trapped gas burnt; gas escape; maintenance and cleaning.
Lösung
①Vent 0.025-0.05mm; ②ends and weld lines; ③trapped gas prevention and control; ④regular cleaning; ⑤burnt monitoring.; after adjustment, continuously sample to verify the effect, and resume mass production only after confirming stability
Wichtigste Erkenntnis
The depth and position of ABS vents are standards; ends and weld lines are key points; maintenance ensures long-term effectiveness.; after confirming effectiveness, fix the parameters and practices into the work instruction to prevent recurrence
ABS; vent; 0.025-0.05mm; end; weld line; burnt

War das hilfreich?

0 Personen fanden dies hilfreich

ChemAI