Menü
Materialien Maschinen
Einblicke
Artikel Videos Problem & Lösung
About
Über Chembull Medienpartner
Kontaktieren Sie uns
Sprache
EnglishالعربيةPortuguêsEspañolDeutschTürkçe한국어
Zurück zu Problem & Lösung
Injection Molding 8 Aufrufe

EVA '2079851475616104452 shrinkage rate management

Problembeschreibung
The dimensional deviation of EVA products is large.
Ursachenanalyse
The shrinkage rate of EVA varies with VA content and foaming tendency; process fluctuations amplify dimensional deviation.; during on-site troubleshooting, verify item by item according to this mechanism, and avoid blindly adjusting the machine based on experience alone
Lösung
①Design the mold based on measured shrinkage rate; ②stabilize the '2079851475616104453; ③control material batches; ④test after aging.; after adjustment, take consecutive samples to verify the effect, and resume mass production only after confirming stability
Wichtigste Erkenntnis
EVA dimensional management starts with the measured shrinkage rate; batch consistency is the foundation of stability.; after confirming effectiveness, fix the parameters and practices into the work instruction to prevent recurrence
EVA; '2079851475616104452; shrinkage rate; dimension; batch; aging

War das hilfreich?

0 Personen fanden dies hilfreich

ChemAI