Processing Machinery
2 Aufrufe
PC/ABS molding cycle
Problembeschreibung
Long cycle and low efficiency.
Ursachenanalyse
Cooling accounts for a large proportion; not optimized.; during on-site troubleshooting, verify item by item according to this mechanism, and avoid blindly adjusting the machine based on experience alone; this mechanism has been repeatedly verified by industry data and should be confirmed first during troubleshooting
Lösung
①Calculate cooling time; ②optimize water channels; ③compress step by step; ④monitor quality.; after adjustment, take continuous samples to verify the effect, and resume mass production only after confirming stability; change only one variable at a time and record the parameter changes, to facilitate locating the effective measures
Wichtigste Erkenntnis
Cycle optimization is data supported.; after confirming effectiveness, fix the parameters and practices into the work instruction to prevent recurrence; include this case in the defect archive as a troubleshooting reference for similar problems later
War das hilfreich?
0 Personen fanden dies hilfreich
Vielen Dank für Ihr Feedback!