메뉴
재료 기계
인사이트
기사 동영상 문제 및 해결책
About
Chembull 소개 미디어 파트너
문의하기
언어
EnglishالعربيةPortuguêsEspañolDeutschTürkçe한국어
문제 및 해결책으로 돌아가기
Molds & Tooling 7 조회수

Product performance decline after water absorption

문제 현상
The product absorbs water in a humid environment, causing performance changes. When this defect occurs in products of Process No. 2, it is usually related to a specific process parameter range or equipment status. If it persists, it will directly affect the product qualification rate and production cycle, increasing material loss and rework costs. Timely diagnosis and elimination is a basic requirement to ensure stable production.
원인 분석
1. Material factor: RIM polyurethane material absorbs water, the content of hydrophilic groups in the formulation is high, insufficient post-curing results in low crosslinking density, and the product surface area is large. 2. Mixing quality factor: In the RIM process, the mixing uniformity of the two components is the foundation of all quality; the Reynolds number of the mixing head, the impingement mixing energy, and the residence time distribution are the key engineering parameters that determine the mixing quality. 3. Temperature control factor: The raw material temperature affects the component viscosity and reaction rate, and the mold temperature affects the curing process and product surface quality; both need to be precisely controlled within a narrow window.
해결 방법
1. Process parameter optimization and adjustment: Increase the crosslinking density to reduce the water absorption rate, coat the product surface for waterproofing, add hydrophobic additives, and fully post-cure. 2. Systematic troubleshooting method: RIM problem troubleshooting follows the order of "formulation -> mixing -> temperature control -> equipment". First check the two-component ratio and catalyst dosage, then check the mixing head and self-cleaning function, next troubleshoot the raw material and mold temperature control, and finally check the accuracy of the metering pump and hydraulic system. 3. Preventive management: Establish standardized process parameter cards and quality control limits for each mold/product, and regularly conduct process capability index (CPK) assessments. For recurring problems, use fishbone diagrams or 5Why analysis to trace the root cause, and solidify countermeasures as PFMEA control points.
핵심 요약
This problem is a typical manifestation of product performance decline after water absorption in the RIM process, and the core of the solution lies in ensuring the precise ratio and sufficient mixing of the two components, while controlling the reaction temperature and curing conditions within the optimal window. It is recommended to start troubleshooting from the mixing system and metering accuracy.
curing degree catalyst dosage mold temperature curing time post-curing

이 정보가 도움이 되었나요?

0 명이 도움이 되었다고 합니다

ChemAI