메뉴
재료 기계
인사이트
기사 동영상 문제 및 해결책
About
Chembull 소개 미디어 파트너
문의하기
언어
EnglishالعربيةPortuguêsEspañolDeutschTürkçe한국어
문제 및 해결책으로 돌아가기
Extrusion & Post 4 조회수

EVA Film Insufficient Crosslinking Degree

문제 현상
The crosslinking degree of the film is tested below the standard, and the weather resistance of the module is in doubt.
원인 분석
Insufficient lamination temperature or time makes the crosslinking reaction incomplete; expired or improperly stored film deactivating the crosslinking agent is also a cause.; During on-site troubleshooting, verify item by item according to this mechanism to avoid blindly adjusting the machine based only on experience
해결 방법
①Set the lamination temperature and time according to the supplier window; ②control the film inventory period and storage conditions; ③regularly test the crosslinking degree; ④sampling verification after lamination.; After adjustment, continuously sample to verify the effect, and resume mass production after confirming stability
핵심 요약
The crosslinking degree is the core indicator of film quality; the lamination process window and material freshness are both indispensable.; After confirming effectiveness, fix the parameters and practices into the work instruction to prevent recurrence
EVA; film; crosslinking degree; lamination; storage; inspection

이 정보가 도움이 되었나요?

0 명이 도움이 되었다고 합니다

ChemAI