메뉴
재료 기계
인사이트
기사 동영상 문제 및 해결책
About
Chembull 소개 미디어 파트너
문의하기
언어
EnglishالعربيةPortuguêsEspañolDeutschTürkçe한국어
문제 및 해결책으로 돌아가기
Material Drying 4 조회수

PA66 startup pre-drying confirmation

문제 현상
Direct production at startup after a long holiday, first batch of products all scrapped for silver streaks
원인 분석
Material and equipment absorbed moisture during shutdown, startup without re-drying confirmation, wet material directly enters the cavity; during on-site troubleshooting, verify item by item according to this mechanism, and avoid blindly adjusting the machine based solely on experience
해결 방법
Post-holiday startup process: re-dry material 4 hours and sample-check moisture content; barrel air-shot discharge until strands bubble-free; first article full inspection before mass production; after adjustment, continuously sample to verify the effect, and resume mass production only after confirming stability
핵심 요약
After shutdown, restarting must re-confirm material and equipment state; after confirming effectiveness, fix the parameters and practices into the work instruction to prevent recurrence; include this case in the defect archive as a troubleshooting reference for subsequent similar problems
PA66startuppre-dryingfirst article

이 정보가 도움이 되었나요?

0 명이 도움이 되었다고 합니다

ChemAI