Injection Molding
6 조회수
PCABS injection speed
문제 현상
PC/ABS injection speed management, balance between filling and shear trapped air.
원인 분석
PC/ABS injection speed; improves mold filling; but shear stress; trapped air and burning; multi-stage injection; structure adaptation.; during on-site troubleshooting, verify item by item according to this mechanism, and avoid blindly adjusting the machine based on experience alone
해결 방법
①Injection speed optimization; ②multi-stage profile; ③shear monitoring; ④venting matching; ⑤structure adaptation.; after adjustment, take continuous samples to verify the effect, and resume mass production only after confirming stability
핵심 요약
The multi-stage management of PCABS injection speed is fine control; balance ensures quality; adaptation ensures structure.; after confirming effectiveness, fix the parameters and practices into the work instruction to prevent recurrence
이 정보가 도움이 되었나요?
0 명이 도움이 되었다고 합니다
의견 주셔서 감사합니다!