메뉴
재료 기계
인사이트
기사 동영상 문제 및 해결책
About
Chembull 소개 미디어 파트너
문의하기
언어
EnglishالعربيةPortuguêsEspañolDeutschTürkçe한국어
문제 및 해결책으로 돌아가기
Molds & Tooling 3 조회수

Much Setup Scrap for PEEK First Articles

문제 현상
Each mold change and startup of PEEK requires dozens of shots to produce qualified parts, high-priced raw material is seriously wasted, and setup cost even exceeds mold cost.
원인 분석
PEEK has a narrow process window, and the multiple parameters of temperature, pressure, and speed are strongly coupled, making trial-and-error setup extremely inefficient; without process data accumulation, every setup starts from scratch.
해결 방법
①Preset the initial process based on Moldflow simulation; ②Establish standard process cards to accumulate historical parameters; ③Sort and recycle setup scrap for downgraded use; ④Use cavity sensing technology to shorten the stabilization time.
핵심 요약
PEEK setup cost must be hedged with data-based management; process cards and simulation analysis are the core tools for reducing trial and error; every kilogram of scrap is a loss of real money.
PEEK;setup;scrap;process card;simulation;cost

이 정보가 도움이 되었나요?

0 명이 도움이 되었다고 합니다

ChemAI