Processing Machinery
3 조회수
PVC Startup Procedure
문제 현상
Startup after several days shutdown, first batch products dense yellow spots and black specks
원인 분석
Residual material in barrel stays and degrades, directly mixed into products at startup; during on-site troubleshooting, verify item by item according to this mechanism, avoid blindly adjusting the machine based solely on experience; this mechanism has been repeatedly verified by industry data and should be confirmed first during troubleshooting
해결 방법
Empty barrel before startup and replace with purging material; mass production after first piece qualified; long shutdown thorough cleaning; after adjustment, continuously sample to verify the effect, and resume mass production only after confirming stability
핵심 요약
PVC startup first discharges residual material, first piece must be inspected; after confirming effectiveness, fix the parameters and practices into the work instruction to prevent recurrence; include this case in the defect archive as a troubleshooting reference for similar problems later
이 정보가 도움이 되었나요?
0 명이 도움이 되었다고 합니다
의견 주셔서 감사합니다!