Injection Molding
4 조회수
SEBS injection cycle too long affecting efficiency
문제 현상
2079851475616104452 cycle exceeds target by over 20%
원인 분석
Cooling time large proportion, insufficient plasticization, slow mold opening and closing
해결 방법
Optimize cooling water channels, increase plasticizing capacity, speed up mold opening and closing
핵심 요약
Cycle optimization is the key to raising output and lowering cost
이 정보가 도움이 되었나요?
0 명이 도움이 되었다고 합니다
의견 주셔서 감사합니다!