Material Drying 5 görüntüleme

TPE first article verification

Sorun Belirtisi
After material and mold changes, bubbles and poor bonding appear in batches; the first article is only checked for appearance
Neden Analizi
TPE is sensitive to moisture content and temperature, and the drying state changes after material change; overmolded parts also need bonding strength verification; if the first article is not fully verified, batch risk is out of control
Çözüm
①the first article performs three verifications of appearance, dimensions, and moisture content; ②overmolded parts add bonding strength testing; ③mass production after parameters are locked; after adjustment, continuously sample to verify the effect, and resume mass production only after confirming stability
Temel Çıkarım
TPE first article verification must include material state and bonding; qualified appearance does not mean qualified function; after confirming effectiveness, fix the parameters and practices into the work instruction to prevent recurrence
TPE;first article verification;moisture content;bonding;material change