Material Analysis
5 görüntüleme
Welding joint leakage of general-purpose polyethylene PPR pipes
Sorun Belirtisi
After hot melt welding of PPR/PP-R pipes, the joints leak in the pressure test, and the weld strength is insufficient.
Welding joint leakage is a common failure point of pipeline systems and affects the safety of the water supply system.
Neden Analizi
(1)The welding temperature is improper, not reaching the melting temperature of the material or too high, causing degradation
(2)The welding time is insufficient, and the depth of the surface molten layer is not enough
(3)The pipe and the fitting are not concentric during welding
(4)The welding surface is contaminated with oil, water, or dust
(5)The pipe wall thickness is uneven or the fitting diameter does not match
Çözüm
(1)Control the hot melt welding temperature at 260-280°C (PPR/PP-R), and strictly calibrate the heating plate temperature
(2)Strictly implement the standard welding time: 5s for DN20 pipe, 7s for DN25 pipe, etc.
(3)Use special clamping tools to ensure that the pipe and the fitting are concentric and aligned
(4)Clean the welding surfaces of the pipe and the fitting before welding to remove oil and dust
(5)Use pipes and fittings of the same brand and series to ensure dimensional matching
Temel Çıkarım
PPR welding joint leakage is caused by improper welding parameters or welding surface contamination, and the welding temperature, time, and cleanliness need to be strictly controlled.
Bu faydalı oldu mu?
0 kişi bunu faydalı buldu
Geri bildiriminiz için teşekkürler!