القائمة
المواد الآلات
رؤى
مقالات مقاطع فيديو المشاكل والحلول
About
عن Chembull شركاء الإعلام
اتصل بنا
اللغة
EnglishالعربيةPortuguêsEspañolDeutschTürkçe한국어
العودة إلى المشاكل والحلول
Injection Molding 5 مشاهدة

Gas-assisted injection is used to reduce shrinkage and warpage but parameters are set improperly

ظاهرة المشكلة
Gas-assisted injection is used to reduce shrinkage and warpage but parameters are set improperly
تحليل الأسباب
Improper gas injection timing, too early gas breakthrough or too late gas channel not formed Improper gas pressure setting, unstable gas channel dimensions Unreasonable gas channel design, gas cannot flow along the predetermined path Gas overflow, bubble marks appear on the product surface Cellulose acetate butyrate melt viscosity affects gas penetration depth
الحل
Gas injection timing when the melt is 70-90% filled Reasonably set gas pressure 5-15MPa Reasonably design the gas channel path Prevent gas overflow, sealing design Adjust gas parameters according to cellulose acetate butyrate viscosity
الخلاصة الأساسية
Gas assist requires precise timing and pressure control
gas-assisted injectiongas timinggas channel designcellulose acetate butyrate

هل كان هذا مفيدًا؟

0 شخص وجدوا هذا مفيدًا

ChemAI