Menü
Materialien Maschinen
Einblicke
Artikel Videos Problem & Lösung
About
Über Chembull Medienpartner
Kontaktieren Sie uns
Sprache
EnglishالعربيةPortuguêsEspañolDeutschTürkçe한국어
Zurück zu Problem & Lösung
Material Drying 6 Aufrufe

PA66 cable tie harness parts

Problembeschreibung
Cable ties break brittlely during winter construction, and the fracture rate rises after half a year in storage
Ursachenanalyse
Cable ties are at their dry-state brittleness peak after demolding, and low-temperature environment makes things worse; open storage keeps moisture content declining, and brittle fracture intensifies with storage time and environmental dryness; during on-site troubleshooting, verify item by item according to this mechanism, avoiding blindly adjusting the machine based only on experience
Lösung
①Moisture condition to equilibrium moisture content before leaving the factory; ②Sealed packaging to maintain the conditioned state; ③Select low-temperature resistant toughened grades for cold-region construction; after adjustment, take continuous samples to verify the effect, confirm stability before resuming mass production
Wichtigste Erkenntnis
Cable ties are the best example of the value of PA66 moisture conditioning; factory moisture conditioning plus sealed moisture retention eliminates brittle fracture before reaching the customer; after confirming effectiveness, fix the parameters and practices into the work instructions to prevent recurrence
PA66;cable tie;moisture conditioning;low temperature;sealed packaging

War das hilfreich?

0 Personen fanden dies hilfreich

ChemAI