Menü
Materialien Maschinen
Einblicke
Artikel Videos Problem & Lösung
About
Über Chembull Medienpartner
Kontaktieren Sie uns
Sprache
EnglishالعربيةPortuguêsEspañolDeutschTürkçe한국어
Zurück zu Problem & Lösung
Injection Molding 6 Aufrufe

PEI Injection Speed Management

Problembeschreibung
Improper PEI injection speed settings cause filling defects or shear problems; the speed window is difficult to grasp.
Ursachenanalyse
PEI's high viscosity requires a relatively high injection speed, recommended at 50~80% of the screw's maximum speed; too fast causes shear heat and air entrapment; too slow causes front freezing and short shots; multi-stage injection balance.
Lösung
①Injection speed in the range of 50~80% of the screw's maximum speed; ②multi-stage injection curve optimization; ③appropriate speed control in the gate area; ④verify filling status with short shot tests.
Wichtigste Erkenntnis
The 50~80% of PEI injection speed is quantitative guidance; multi-stage curves are a refined means; short shot tests provide intuitive verification.; after confirming effectiveness, fix the parameters and practices into the work instruction to prevent recurrence
PEI;injection speed;50%;multi-stage;shear;short shot

War das hilfreich?

0 Personen fanden dies hilfreich

ChemAI