Menü
Materialien Maschinen
Einblicke
Artikel Videos Problem & Lösung
About
Über Chembull Medienpartner
Kontaktieren Sie uns
Sprache
EnglishالعربيةPortuguêsEspañolDeutschTürkçe한국어
Zurück zu Problem & Lösung
Molds & Tooling 2 Aufrufe

PESU Holding Pressure Management

Problembeschreibung
PESU holding pressure and time, sink mark and stress balance.
Ursachenanalyse
PESU holding pressure compensates shrinkage; time according to wall thickness; stress influence; gate freezing; weight optimization.; during on-site troubleshooting, verify item by item according to this mechanism, and avoid blindly adjusting the machine based solely on experience
Lösung
①Holding pressure optimization; ②time according to wall thickness; ③stress balance; ④weight monitoring; ⑤solidification and execution.; after adjustment, continuously sample to verify the effect, and resume mass production only after confirming stability
Wichtigste Erkenntnis
PESU holding pressure is the balance of quality and stress; optimization based on testing; solidification ensures consistency.; after confirming effectiveness, solidify the parameters and practices into the work instruction to prevent recurrence
PESU; holding pressure; sink mark; wall thickness; stress; weight

War das hilfreich?

0 Personen fanden dies hilfreich

ChemAI