Menü
Materialien Maschinen
Einblicke
Artikel Videos Problem & Lösung
About
Über Chembull Medienpartner
Kontaktieren Sie uns
Sprache
EnglishالعربيةPortuguêsEspañolDeutschTürkçe한국어
Zurück zu Problem & Lösung
Molds & Tooling 13 Aufrufe

Insufficient mold filling flow length

Problembeschreibung
Thin-wall or complex parts of PES products are incompletely filled
Ursachenanalyse
Barrel temperature too low <310°C causing high melt viscosity; mold temperature <120°C causes the melt front to cool rapidly
Lösung
Increase the melt temperature to 340-370°C to reduce melt viscosity; increase the mold temperature to 140-160°C to extend the melt flow window
Wichtigste Erkenntnis
PES requires higher processing temperature and mold temperature to assist filling
mold fillingmelt temperaturemold temperaturemelt viscosityflow window

War das hilfreich?

0 Personen fanden dies hilfreich

ChemAI