Material Analysis
10 Aufrufe
PMMA First Article Optical Verification
Problembeschreibung
Optical defects found after mass production of transparent parts; the first article only underwent dimensional inspection
Ursachenanalyse
Dimensional inspection cannot find defects such as haze, stress patterns, and weld lines on PMMA optical parts; the first article must include light transmittance and stress inspection to intercept batch risks
Lösung
①First article undergoes four verifications: appearance, dimensions, light transmittance, and stress; ②check stress distribution with a polarizer; ③mass production after parameter locking; after adjustment, take samples continuously to verify the effect, and resume mass production only after confirming stability
Wichtigste Erkenntnis
First articles of PMMA optical parts must be optically examined; four verifications plus polarized stress inspection are the institutional bottom line; after confirming effectiveness, solidify the parameters and practices into the work instruction to prevent recurrence
War das hilfreich?
0 Personen fanden dies hilfreich
Vielen Dank für Ihr Feedback!