Menü
Materialien Maschinen
Einblicke
Artikel Videos Problem & Lösung
About
Über Chembull Medienpartner
Kontaktieren Sie uns
Sprache
EnglishالعربيةPortuguêsEspañolDeutschTürkçe한국어
Zurück zu Problem & Lösung
Extrusion & Post 9 Aufrufe

Solution for quality inspection of calcium-zinc stabilizer in sheet calendering

Problembeschreibung
The calcium-zinc PVC system shows quality inspection-related abnormalities in the sheet calendering production stage, product quality is unstable.
Ursachenanalyse
The precipitation characteristic of calcium-zinc stabilizers produces quality inspection problems under specific working conditions.
Lösung
From the formulation perspective, reduce lubrication, combined with process optimization to solve it.
Wichtigste Erkenntnis
The quality inspection problem of the calcium-zinc system in the sheet calendering stage requires comprehensive solution of formulation and process.
calcium-zinc stabilizersheet calenderingquality inspectionprocessing

War das hilfreich?

0 Personen fanden dies hilfreich

ChemAI