Menú
Materiales Maquinaria
Perspectivas
Artículos Vídeos Problema y solución
About
Acerca de Chembull Socios de medios
Contáctenos
Idioma
EnglishالعربيةPortuguêsEspañolDeutschTürkçe한국어
Volver a Problema y solución
Processing Machinery 8 visualizaciones

EVA Hot Melt Adhesive Weak Bonding

Fenómeno del problema
The bonded parts open and fall off.
Análisis de la causa
Contamination of the adhered surface or low temperature causes poor wetting of the adhesive; exceeding the open time beyond the adhesive window also causes failure.; During on-site troubleshooting, verify item by item according to this mechanism to avoid blindly adjusting the machine based only on experience
Solución
①Clean the adhered surface; ②control the substrate temperature; ③complete the bonding within the open time; ④match the adhesive type with the substrate.; After adjustment, continuously sample to verify the effect, and resume mass production after confirming stability
Conclusión clave
Bonding quality is a combination of surface state and process timing; open time management is often overlooked.; After confirming effectiveness, fix the parameters and practices into the work instruction to prevent recurrence
EVA; hot melt adhesive; bonding; wetting; open time; surface

¿Le ha resultado útil?

0 personas encontraron esto útil

ChemAI