Menú
Materiales Maquinaria
Perspectivas
Artículos Vídeos Problema y solución
About
Acerca de Chembull Socios de medios
Contáctenos
Idioma
EnglishالعربيةPortuguêsEspañolDeutschTürkçe한국어
Volver a Problema y solución
Processing Machinery 8 visualizaciones

EVA foaming decomposition temperature management

Fenómeno del problema
Premature foaming or insufficient foaming during the foaming process.
Análisis de la causa
The decomposition temperature of AC foaming agent is 160~200°C; if the processing temperature reaches the decomposition point too early, premature foaming occurs; if the temperature is insufficient, foaming is inadequate.; during on-site troubleshooting, verify item by item according to this mechanism, and avoid blindly adjusting the machine based on experience alone
Solución
①Control the temperature below the decomposition point in the mixing stage; ②accurately control the temperature in the in-mold foaming stage; ③monitor the actual temperature curve; ④set the process according to the characteristics of the foaming agent.
Conclusión clave
Foaming timing relies on precise temperature management; the temperature division of labor between the mixing and foaming stages must be clear.; after confirming effectiveness, fix the parameters and practices into the work instruction to prevent recurrence
EVA; foaming; decomposition temperature; AC foaming agent; temperature control; timing

¿Le ha resultado útil?

0 personas encontraron esto útil

ChemAI