Menú
Materiales Maquinaria
Perspectivas
Artículos Vídeos Problema y solución
About
Acerca de Chembull Socios de medios
Contáctenos
Idioma
EnglishالعربيةPortuguêsEspañolDeutschTürkçe한국어
Volver a Problema y solución
Material Drying 8 visualizaciones

Control of strength abnormality in PEOX coating water-soluble bags

Fenómeno del problema
During PEOX coating production of water-soluble bags, the problem of not up to standard strength occurs.
Análisis de la causa
Mainly due to the processing temperature deviating from the window +70-90°C, moisture content >0.3% exceeding the standard, and insufficient cooling.
Solución
Strictly control the temperature within the recommended range, fully dry the material to moisture content <0.1%, and shorten the residence time.
Conclusión clave
PEOX processing requires precise control of the three elements of temperature, humidity, and residence time.
PEOXtemperature and humidity controlstrengthmoisture contentresidence time

¿Le ha resultado útil?

0 personas encontraron esto útil

ChemAI