메뉴
재료 기계
인사이트
기사 동영상 문제 및 해결책
About
Chembull 소개 미디어 파트너
문의하기
언어
EnglishالعربيةPortuguêsEspañolDeutschTürkçe한국어
문제 및 해결책으로 돌아가기
Material Analysis 5 조회수

Leakage of welded joints of polyolefin plastomer PPR pipes

문제 현상
After hot-melt welding of PPR/PP-R pipes, the joints leak in the pressure test and the weld strength is insufficient. Welded joint leakage is a common failure point of pipeline systems and affects the safety of water supply systems.
원인 분석
(1)The welding temperature is improper, not reaching the melting temperature of the material or too high, causing degradation (2)The welding time is insufficient and the depth of the surface molten layer is not enough (3)The pipe and fitting are not concentric during welding (4)The welding surface is contaminated by oil, water, or dust (5)The pipe wall thickness is uneven or the fitting diameter does not match
해결 방법
(1)Control the hot-melt welding temperature at 260-280°C (PPR/PP-R), and strictly calibrate the heating plate temperature (2)Strictly implement the welding time standards: 5s for DN20 pipes, 7s for DN25 pipes, etc. (3)Use special clamping tools to ensure the pipe and fitting are concentrically aligned (4)Clean the welding surfaces of the pipe and fitting before welding to remove oil and dust (5)Use pipes and fittings of the same brand and series to ensure dimensional matching
핵심 요약
PPR welded joint leakage is caused by improper welding parameters or contamination of the welding surface, and the welding temperature, time, and cleanliness need to be strictly controlled.
PPR weldinghot-melt weldingwelding temperaturewelding timefitting matching

이 정보가 도움이 되었나요?

0 명이 도움이 되었다고 합니다

ChemAI