Leakage of welded joints of polyolefin plastomer PPR pipes

Fenómeno del problema
After hot-melt welding of PPR/PP-R pipes, the joints leak in the pressure test and the weld strength is insufficient. Welded joint leakage is a common failure point of pipeline systems and affects the safety of water supply systems.
Análisis de la causa
(1)The welding temperature is improper, not reaching the melting temperature of the material or too high, causing degradation (2)The welding time is insufficient and the depth of the surface molten layer is not enough (3)The pipe and fitting are not concentric during welding (4)The welding surface is contaminated by oil, water, or dust (5)The pipe wall thickness is uneven or the fitting diameter does not match
Solución
(1)Control the hot-melt welding temperature at 260-280°C (PPR/PP-R), and strictly calibrate the heating plate temperature (2)Strictly implement the welding time standards: 5s for DN20 pipes, 7s for DN25 pipes, etc. (3)Use special clamping tools to ensure the pipe and fitting are concentrically aligned (4)Clean the welding surfaces of the pipe and fitting before welding to remove oil and dust (5)Use pipes and fittings of the same brand and series to ensure dimensional matching
Conclusión clave
PPR welded joint leakage is caused by improper welding parameters or contamination of the welding surface, and the welding temperature, time, and cleanliness need to be strictly controlled.