Menu
Materials Machinery
Insights
Articles Videos Problem & Solution
About
About Chembull Media Partners
Contact Us
Language
EnglishالعربيةPortuguêsEspañolDeutschTürkçe한국어
Back to Problem & Solution
Molds & Tooling 2 views

Insufficient Equipment Maintenance During Processing of High-Density Polyethylene High-Density Polyethylene

Problem Phenomenon
Equipment failures occur frequently, product quality fluctuates, and production efficiency is low. Insufficient maintenance leads to decreased equipment precision, worse plasticization quality, and increased energy consumption.
Cause Analysis
(1)The equipment has been running for a long time without maintenance according to the cycle (2)The wear of the screw and barrel is not checked and replaced in time (3)The mold is not regularly maintained and polished (4)Sensors and instruments are not regularly calibrated (5)The lubricating oil is not replaced on time, and mechanical parts wear
Solution
(1)Establish an equipment preventive maintenance plan, with monthly, quarterly, and annual maintenance (2)Regularly check the screw gap (not exceeding 0.2mm) and barrel wear (3)Perform maintenance and polishing on the mold every 100,000 molding cycles (4)Calibrate the temperature sensors and pressure sensors every quarter (5)Establish equipment archives to record the maintenance and repair history
Key Takeaway
Equipment maintenance is the basis of stable production, and a standardized regular maintenance system and record system need to be established.
equipment maintenancepreventive maintenancescrew gapmold maintenancesensor calibration

Was this helpful?

0 people found this helpful

ChemAI