Processing Machinery 10 visualizações

HDPE Municipal Manhole Ring

Fenómeno do problema
Inspection manhole ring deforms after heavy loading
Análise das causas
Vehicle rolling loads are large, and ordinary HDPE has insufficient rigidity; during on-site troubleshooting, verify item by item according to this mechanism to avoid blindly adjusting the machine based solely on experience; this mechanism has been repeatedly verified by industry data and should be confirmed first during troubleshooting
Solução
Select high-rigidity reinforced grades for the manhole ring; add ribs to the structure; test load according to municipal standards; after adjustment, continuously sample to verify the effect, and resume mass production only after confirming stability; change only one variable at a time and record parameter changes to facilitate locating effective measures
Conclusão principal
Municipal parts are verified according to standard loads; after confirming effectiveness, solidify the parameters and practices into the work instruction to prevent recurrence; include this case in the defect archive as a reference for troubleshooting similar problems in the future
HDPEmanhole ringloadreinforcement