Menu
Materiais Máquinas
Perspetivas
Artigos Vídeos Problema e solução
About
Sobre a Chembull Parceiros de média
Contacte-nos
Idioma
EnglishالعربيةPortuguêsEspañolDeutschTürkçe한국어
Voltar a Problema e solução
Material Drying 7 visualizações

PA66 internal stress cracking

Fenómeno do problema
PA66 assembled parts crack at the screw boss root after being placed for several weeks
Análise das causas
Molding internal stress concentrates at wall thickness abrupt changes, and superimposed assembly stress causes delayed cracking; internal stress release after PA66 moisture absorption also induces it; during on-site troubleshooting, verify item by item according to this mechanism, avoiding blindly adjusting the machine based only on experience
Solução
Structural rounding; raise mold temperature to reduce orientation stress; moisture conditioning after molding; assembly torque specifications; after adjustment, take continuous samples to verify the effect, confirm stability before resuming mass production
Conclusão principal
Delayed cracking requires prevention in three aspects: structure, process, and assembly; after confirming effectiveness, fix the parameters and practices into the work instructions to prevent recurrence; include this case in the defect archive as a troubleshooting reference for subsequent similar problems
PA66internal stressdelayed crackingmoisture conditioning

Isto foi útil?

0 pessoas acharam isto útil

ChemAI