Menu
Materiais Máquinas
Perspetivas
Artigos Vídeos Problema e solução
About
Sobre a Chembull Parceiros de média
Contacte-nos
Idioma
EnglishالعربيةPortuguêsEspañolDeutschTürkçe한국어
Voltar a Problema e solução
Material Drying 7 visualizações

PA6 Plum Rain Season Drying Intensification

Fenómeno do problema
Producing PA6 with conventional processes in the plum rain season, the defect rate of silver streaks and bubbles rises significantly
Análise das causas
In the plum rain season, the ambient humidity is above 90%, the raw material absorbs moisture quickly, the dryer load increases, the dehydration margin of conventional drying conditions is offset by the high-humidity environment, and the moisture content at the drying endpoint is high
Solução
In the plum rain season, extend the drying time by 1-2 hours and increase the frequency of moisture content sampling; dehumidify the workshop and raw material warehouse, and open raw materials just before use; when necessary, take the upper drying temperature limit of 100°C
Conclusão principal
In high-humidity seasons, the drying standard must be systematically raised, and relying on the original process parameters alone is not enough; after confirming effectiveness, fix the parameters and practices into the work instructions to prevent recurrence; include this case in the defect archive as a reference for troubleshooting similar problems in the future
PA6plum rain seasonhumiditydrying intensification

Isto foi útil?

0 pessoas acharam isto útil

ChemAI