Processing Machinery
6 visualizações
PEI Screw Shear Overheating
Fenómeno do problema
Excessive PEI screw speed causes shear overheating, triggering material degradation; the actually measured melt temperature exceeds the standard while the gauge shows normal.
Análise das causas
PEI screw speed should be controlled at 20~60rpm; excessive speed easily causes shear overheating and triggers degradation; back pressure of 1~5MPa is appropriate, and too high increases melt temperature; deep-flight, low compression ratio (1.5~2.5:1) screws suit high viscosity.
Solução
①Control screw speed at 20~60rpm; ②keep back pressure at a low level of 1~5MPa; ③select a deep-flight, low compression ratio screw; ④verify shear heat with actually measured melt temperature.
Conclusão principal
The 20~60rpm and 1~5MPa back pressure in PEI screw management are quantitative guidance; low-shear configuration protects heat-sensitive materials; actual temperature measurement prevents gauge display distortion.
Isto foi útil?
0 pessoas acharam isto útil
Obrigado pelo seu comentário!