Menu
Materiais Máquinas
Perspetivas
Artigos Vídeos Problema e solução
About
Sobre a Chembull Parceiros de média
Contacte-nos
Idioma
EnglishالعربيةPortuguêsEspañolDeutschTürkçe한국어
Voltar a Problema e solução
Processing Machinery 6 visualizações

SMMA Clamping Force Reduction

Fenómeno do problema
SMMA requires lower clamping force which can be reduced by 20%, cost saving.
Análise das causas
SMMA requires lower clamping force which can be reduced by as much as 20%; reduced processing cost; equipment utilization; but flash risk; clamping management.; during on-site troubleshooting, verify item by item according to this mechanism, avoiding blind machine adjustment based solely on experience
Solução
①Optimize and reduce clamping force; ②flash monitoring; ③equipment utilization; ④cost accounting; ⑤quality guarantee.; after adjustment, continuously sample to verify the effect, and resume mass production only after confirming stability
Conclusão principal
SMMA low clamping force is a cost advantage; but flash prevention cannot be relaxed; accounting verifies benefits.; after confirming effectiveness, fix the parameters and practices into the work instruction to prevent recurrence
SMMA;clamping force;20%;cost;flash;accounting

Isto foi útil?

0 pessoas acharam isto útil

ChemAI