Menu
Materiais Máquinas
Perspetivas
Artigos Vídeos Problema e solução
About
Sobre a Chembull Parceiros de média
Contacte-nos
Idioma
EnglishالعربيةPortuguêsEspañolDeutschTürkçe한국어
Voltar a Problema e solução
Molds & Tooling 7 visualizações

Insufficient equipment maintenance during linear low-density polyethylene linear low-density polyethylene processing

Fenómeno do problema
Equipment failures occur frequently, product quality fluctuates, and production efficiency is low. Insufficient maintenance leads to reduced equipment precision, worse plasticization quality and increased energy consumption.
Análise das causas
(1) Equipment runs for a long time without periodic maintenance (2) Screw and barrel wear is not inspected and replaced in time (3) The mold is not regularly maintained and polished (4) Sensors and instruments are not regularly calibrated (5) Lubricating oil is not replaced on time, causing mechanical parts to wear
Solução
(1) Establish an equipment preventive maintenance plan with monthly, quarterly and annual maintenance (2) Regularly check screw clearance (not exceeding 0.2mm) and barrel wear (3) Perform maintenance and polishing on the mold every 100,000 shots (4) Calibrate temperature sensors and pressure sensors quarterly (5) Establish equipment archives to record maintenance history
Conclusão principal
Equipment maintenance is the foundation of stable production; a standardized regular maintenance system and record system need to be established.
equipment maintenancepreventive maintenancescrew clearancemold maintenancesensor calibration

Isto foi útil?

0 pessoas acharam isto útil

ChemAI