Injection Molding
14 visualizações
Low Utilization Rate of PBT '2079851475616104452 Machines
Fenómeno do problema
Due to frequent cleaning for color and material changes, the proportion of effective production time of the equipment is low.
Análise das causas
The cleaning requirements between PBT of different colors and grades are high, and the purging material consumption is large and takes a long time.
Solução
Optimize production scheduling to reduce the frequency of color changes; use rapid cleaning technologies such as dry ice cleaning; standardize the color series.
Conclusão principal
PBT production scheduling optimization can improve equipment utilization.
Isto foi útil?
0 pessoas acharam isto útil
Obrigado pelo seu comentário!