Menü
Malzemeler Makineler
İçgörüler
Makaleler Videolar Sorun ve Çözüm
About
Chembull Hakkında Medya Ortakları
Bize Ulaşın
Dil
EnglishالعربيةPortuguêsEspañolDeutschTürkçe한국어
Sorun ve Çözüme Geri Dön
Material Analysis 12 görüntüleme

Filling Speed and Shear Darkening of PEEK

Sorun Belirtisi
[Problem Phenomenon] PEEK thin-wall parts freeze and short-shot when filling is slow, and the melt shears, darkens, and discolors when filling is fast
Neden Analizi
A filling time of 1-3 seconds is the conventional target: too slow and the front freezes into a short shot, too fast and shear heating darkens the melt; products below 150 grams are especially sensitive; during on-site troubleshooting, verify item by item according to this mechanism, avoiding blind adjustment based solely on experience
Çözüm
Adjust the filling time toward the 1-3 second target; for thin-wall short shots, prioritize raising mold temperature and nozzle temperature; for shear darkening, reduce speed and check whether the gate size is too narrow; after adjustment, continuously sample to verify the effect, and resume mass production only after confirming stability
Temel Çıkarım
1-3 second filling is the rhythm benchmark of PEEK — check one end each for short shot and darkening; after confirming effectiveness, solidify the parameters and practices into the work instruction to prevent recurrence
filling time shear darkening short shot thin wall

Bu faydalı oldu mu?

0 kişi bunu faydalı buldu

ChemAI