Material Drying 4 görüntüleme

PET first article full-item verification

Sorun Belirtisi
After material change, bubbles and yellowing appear in batches; the first article was only visually inspected
Neden Analizi
After PET material change, drying state, melt temperature, and filtration pressure differential may all change; visual first inspection alone cannot detect hidden deviations such as IV decline and excessive moisture content
Çözüm
① Perform full-item verification of moisture content, appearance, IV or melt index, and dimensions on the first article; ② additionally measure thickness and transparency on sheet first articles; ③ mass production after parameter locking; after adjustment, continuously sample to verify the effect, and resume mass production only after confirming stability
Temel Çıkarım
PET first article verification must include material state indicators; full-item verification plus parameter locking is the institutional bottom line for preventing batch accidents; after confirming effectiveness, fix the parameters and practices into the work instruction to prevent recurrence
PET;first article verification;IV;moisture content;parameter locking