القائمة
المواد الآلات
رؤى
مقالات مقاطع فيديو المشاكل والحلول
About
عن Chembull شركاء الإعلام
اتصل بنا
اللغة
EnglishالعربيةPortuguêsEspañolDeutschTürkçe한국어
العودة إلى المشاكل والحلول
Processing Machinery 6 مشاهدة

HDPE startup procedure

ظاهرة المشكلة
After starting up following a few days of shutdown, the first batch of products has degradation spots
تحليل الأسباب
The retained material from the shutdown is oxidized and mixed into the products at startup; when troubleshooting on site, verify item by item according to this mechanism, and avoid blindly adjusting the machine based only on experience; this mechanism has been repeatedly verified by industry data and should be confirmed first during troubleshooting
الحل
Empty the barrel before startup; air-shoot until the extrudate strand is normal; check the first piece; after adjustment, continuously sample to verify the effect, and resume mass production only after confirming stability; change only one variable at a time and record parameter changes, to facilitate locating effective measures
الخلاصة الأساسية
After a shutdown, discharge the residual material first when restarting; after confirming effectiveness, solidify the parameters and practices into the work instruction to prevent recurrence; include this case in the defect archive as a troubleshooting reference for similar future problems
HDPEstartupemptyingfirst piece

هل كان هذا مفيدًا؟

0 شخص وجدوا هذا مفيدًا

ChemAI