القائمة
المواد الآلات
رؤى
مقالات مقاطع فيديو المشاكل والحلول
About
عن Chembull شركاء الإعلام
اتصل بنا
اللغة
EnglishالعربيةPortuguêsEspañolDeutschTürkçe한국어
العودة إلى المشاكل والحلول
Extrusion & Post 6 مشاهدة

LLDPE film auxiliary equipment matching

ظاهرة المشكلة
The main machine is normal but the auxiliary equipment state drags down overall quality.
تحليل الأسباب
The state of the air ring, bubble stabilizing frame, haul-off, winder and other auxiliary equipment directly affects film quality; auxiliary equipment maintenance is often overlooked.; During on-site troubleshooting, verify item by item according to this mechanism, avoiding blindly adjusting the machine based only on experience.
الحل
①Establish an auxiliary equipment inspection system; ②calibrate haul-off and winding; ③maintain the air ring and bubble stabilizing frame; ④train auxiliary equipment maintenance.; After adjustment, continuously sample to verify the effect, and resume mass production only after confirming stability.
الخلاصة الأساسية
Film quality is the result of whole-line coordination; auxiliary equipment management must be valued equally with the main machine.; After confirming effectiveness, fix the parameters and practices into the work instruction to prevent recurrence.
LLDPE; film; auxiliary equipment; inspection; maintenance; coordination

هل كان هذا مفيدًا؟

0 شخص وجدوا هذا مفيدًا

ChemAI