Menú
Materiales Maquinaria
Perspectivas
Artículos Vídeos Problema y solución
About
Acerca de Chembull Socios de medios
Contáctenos
Idioma
EnglishالعربيةPortuguêsEspañolDeutschTürkçe한국어
Volver a Problema y solución
Extrusion & Post 3 visualizaciones

LLDPE film auxiliary equipment matching

Fenómeno del problema
The main machine is normal but the auxiliary equipment state drags down overall quality.
Análisis de la causa
The state of the air ring, bubble stabilizing frame, haul-off, winder and other auxiliary equipment directly affects film quality; auxiliary equipment maintenance is often overlooked.; During on-site troubleshooting, verify item by item according to this mechanism, avoiding blindly adjusting the machine based only on experience.
Solución
①Establish an auxiliary equipment inspection system; ②calibrate haul-off and winding; ③maintain the air ring and bubble stabilizing frame; ④train auxiliary equipment maintenance.; After adjustment, continuously sample to verify the effect, and resume mass production only after confirming stability.
Conclusión clave
Film quality is the result of whole-line coordination; auxiliary equipment management must be valued equally with the main machine.; After confirming effectiveness, fix the parameters and practices into the work instruction to prevent recurrence.
LLDPE; film; auxiliary equipment; inspection; maintenance; coordination

¿Le ha resultado útil?

0 personas encontraron esto útil

ChemAI