القائمة
المواد الآلات
رؤى
مقالات مقاطع فيديو المشاكل والحلول
About
عن Chembull شركاء الإعلام
اتصل بنا
اللغة
EnglishالعربيةPortuguêsEspañolDeutschTürkçe한국어
العودة إلى المشاكل والحلول
Molds & Tooling 6 مشاهدة

PVC Short Shot Troubleshooting

ظاهرة المشكلة
Thin-wall parts were underfilled, temperature-raising room was extremely small, and raising pressure approached flash
تحليل الأسباب
PVC's narrow window limits temperature-raising means; short shot is mainly solved by pressure and runner optimization; high viscosity makes thin-wall filling inherently difficult, and wall thickness below 2mm is high risk
الحل
①Design wall thickness not less than 2mm; ②increase injection pressure combined with enlarged gate; ③select high-flow grades for complex parts; after adjustment, continuously sample to verify the effect, and resume mass production after confirming stability
الخلاصة الأساسية
The solution space for PVC short shot lies in pressure and structure; limited temperature means determines that design must come first; after confirming effectiveness, fix the parameters and practices into the work instruction to prevent recurrence
PVC;short shot;thin wall;2mm;high flow

هل كان هذا مفيدًا؟

0 شخص وجدوا هذا مفيدًا

ChemAI