Menü
Materialien Maschinen
Einblicke
Artikel Videos Problem & Lösung
About
Über Chembull Medienpartner
Kontaktieren Sie uns
Sprache
EnglishالعربيةPortuguêsEspañolDeutschTürkçe한국어
Zurück zu Problem & Lösung
Molds & Tooling 2 Aufrufe

PC/ABS weld line

Problembeschreibung
Weld lines are obvious and low in strength.
Ursachenanalyse
The front temperature of the two flow fronts is low and fusion is poor; low mold temperature and slow speed both aggravate it.; during on-site troubleshooting, verify item by item according to this mechanism, and avoid blindly adjusting the machine based on experience alone
Lösung
①Raise melt and mold temperature; ②optimize gate position; ③increase confluence speed; ④set venting and overflow wells.; after adjustment, take continuous samples to verify the effect, and resume mass production only after confirming stability
Wichtigste Erkenntnis
Weld line management relies on temperature and gate; high mold temperature is particularly effective for PC/ABS weld lines.; after confirming effectiveness, fix the parameters and practices into the work instruction to prevent recurrence
PC/ABS;weld line;temperature;gate;confluence;venting

War das hilfreich?

0 Personen fanden dies hilfreich

ChemAI