Menú
Materiales Maquinaria
Perspectivas
Artículos Vídeos Problema y solución
About
Acerca de Chembull Socios de medios
Contáctenos
Idioma
EnglishالعربيةPortuguêsEspañolDeutschTürkçe한국어
Volver a Problema y solución
Processing Machinery 8 visualizaciones

ABS unmelted material

Fenómeno del problema
ABS unmelted material, screw design or melt temperature insufficient, plasticization management.
Análisis de la causa
ABS unmelted material; unsuitable screw design; insufficient melt temperature; poor plasticization; particle residue; BASF Engineering Plastics Guide.; During on-site troubleshooting, verify item by item according to this mechanism, and avoid blindly adjusting the machine based only on experience
Solución
①Screw design optimization; ②increase melt temperature; ③plasticization quality; ④particle inspection; ⑤equipment assessment.; After adjustment, continuously sample to verify the effect, and resume mass production only after confirming stability
Conclusión clave
Screw and temperature are the main causes of ABS unmelted material; plasticization quality is the core; assessment ensures equipment matching.; After confirming effectiveness, fix the parameters and practices into the work instruction to prevent recurrence
ABS; unmelted; screw; temperature; plasticization; particle

¿Le ha resultado útil?

0 personas encontraron esto útil

ChemAI