Blow Molding
11 visualizaciones
COC Cost Management
Fenómeno del problema
COC cost and value, performance premium assessment.
Análisis de la causa
COC cost; performance value; application matching; replacement comparison; scale effect; return on investment.; During on-site troubleshooting, verify item by item according to this mechanism to avoid blindly adjusting the machine based only on experience
Solución
①Cost analysis; ②value assessment; ③application matching; ④replacement comparison; ⑤scale optimization.; After adjustment, continuously sample to verify the effect, and resume mass production after confirming stability
Conclusión clave
COC cost management should be value-oriented; performance is the core premium; assessment ensures return on investment.; After confirming effectiveness, fix the parameters and practices into the work instruction to prevent recurrence
¿Le ha resultado útil?
0 personas encontraron esto útil
¡Gracias por sus comentarios!