Menu
Materiais Máquinas
Perspetivas
Artigos Vídeos Problema e solução
About
Sobre a Chembull Parceiros de média
Contacte-nos
Idioma
EnglishالعربيةPortuguêsEspañolDeutschTürkçe한국어
Voltar a Problema e solução
Blow Molding 15 visualizações

COC Cost Management

Fenómeno do problema
COC cost and value, performance premium assessment.
Análise das causas
COC cost; performance value; application matching; replacement comparison; scale effect; return on investment.; During on-site troubleshooting, verify item by item according to this mechanism to avoid blindly adjusting the machine based only on experience
Solução
①Cost analysis; ②value assessment; ③application matching; ④replacement comparison; ⑤scale optimization.; After adjustment, continuously sample to verify the effect, and resume mass production after confirming stability
Conclusão principal
COC cost management should be value-oriented; performance is the core premium; assessment ensures return on investment.; After confirming effectiveness, fix the parameters and practices into the work instruction to prevent recurrence
COC; cost; value; performance; matching; scale

Isto foi útil?

0 pessoas acharam isto útil

ChemAI