Menú
Materiales Maquinaria
Perspectivas
Artículos Vídeos Problema y solución
About
Acerca de Chembull Socios de medios
Contáctenos
Idioma
EnglishالعربيةPortuguêsEspañolDeutschTürkçe한국어
Volver a Problema y solución
Processing Machinery 8 visualizaciones

HDPE storage management

Fenómeno del problema
Bubbles appear during processing after HDPE pellets are stored open
Análisis de la causa
Surface-attached water accumulates, especially in powder and recycled material; when troubleshooting on site, verify item by item according to this mechanism, and avoid blindly adjusting the machine based only on experience; this mechanism has been repeatedly verified by industry data and should be confirmed first during troubleshooting
Solución
Store pellets sealed; dry recycled material; first in first out; after adjustment, continuously sample to verify the effect, and resume mass production only after confirming stability; change only one variable at a time and record parameter changes, to facilitate locating effective measures
Conclusión clave
HDPE storage: sealed, first in first out; after confirming effectiveness, solidify the parameters and practices into the work instruction to prevent recurrence; include this case in the defect archive as a troubleshooting reference for similar future problems
HDPEstoragesealingattached water

¿Le ha resultado útil?

0 personas encontraron esto útil

ChemAI