Injection Molding
8 visualizaciones
TPU '2079851475616104452 cycle too long affecting efficiency
Fenómeno del problema
The '2079851475616104452 cycle exceeds the target by more than 20%
Análisis de la causa
Cooling time accounts for a large proportion, plasticization is insufficient, mold opening and closing is slow
Solución
Optimize the cooling water channels, increase the plasticizing capacity, increase mold opening and closing
Conclusión clave
Cycle optimization is the key to increasing production and reducing costs
¿Le ha resultado útil?
0 personas encontraron esto útil
¡Gracias por sus comentarios!