메뉴
재료 기계
인사이트
기사 동영상 문제 및 해결책
About
Chembull 소개 미디어 파트너
문의하기
언어
EnglishالعربيةPortuguêsEspañolDeutschTürkçe한국어
문제 및 해결책으로 돌아가기
Molds & Tooling 3 조회수

PC assembly stress control

문제 현상
Screw boss roots crack, snap-fits break after assembly, problems appear only days after assembly
원인 분석
Excessive screw torque and interference fit keep PC parts in a stressed deformation state for a long time, cracks initiate and propagate during creep and stress relaxation; rigid mismatch between metal parts and PC aggravates local stress
해결 방법
①Screw torque set at 70% of material yield strength with elastic washers added; ②Avoid interference fit, leave creep allowance on mating surfaces; ③Add ribs and rounds to strengthen stressed areas
핵심 요약
Assembly stress is a typical cause of delayed cracking; assembly loads must be included in the stress budget of PC parts at the design stage;After confirming effectiveness, solidify the parameters and practices into the work instruction to prevent recurrence
PC;assembly stress;screw boss;torque;interference

이 정보가 도움이 되었나요?

0 명이 도움이 되었다고 합니다

ChemAI