القائمة
المواد الآلات
رؤى
مقالات مقاطع فيديو المشاكل والحلول
About
عن Chembull شركاء الإعلام
اتصل بنا
اللغة
EnglishالعربيةPortuguêsEspañolDeutschTürkçe한국어
العودة إلى المشاكل والحلول
Molds & Tooling 5 مشاهدة

PC assembly stress control

ظاهرة المشكلة
Screw boss roots crack, snap-fits break after assembly, problems appear only days after assembly
تحليل الأسباب
Excessive screw torque and interference fit keep PC parts in a stressed deformation state for a long time, cracks initiate and propagate during creep and stress relaxation; rigid mismatch between metal parts and PC aggravates local stress
الحل
①Screw torque set at 70% of material yield strength with elastic washers added; ②Avoid interference fit, leave creep allowance on mating surfaces; ③Add ribs and rounds to strengthen stressed areas
الخلاصة الأساسية
Assembly stress is a typical cause of delayed cracking; assembly loads must be included in the stress budget of PC parts at the design stage;After confirming effectiveness, solidify the parameters and practices into the work instruction to prevent recurrence
PC;assembly stress;screw boss;torque;interference

هل كان هذا مفيدًا؟

0 شخص وجدوا هذا مفيدًا

ChemAI