Molds & Tooling
2 Aufrufe
PC assembly stress control
Problembeschreibung
Screw boss roots crack, snap-fits break after assembly, problems appear only days after assembly
Ursachenanalyse
Excessive screw torque and interference fit keep PC parts in a stressed deformation state for a long time, cracks initiate and propagate during creep and stress relaxation; rigid mismatch between metal parts and PC aggravates local stress
Lösung
①Screw torque set at 70% of material yield strength with elastic washers added; ②Avoid interference fit, leave creep allowance on mating surfaces; ③Add ribs and rounds to strengthen stressed areas
Wichtigste Erkenntnis
Assembly stress is a typical cause of delayed cracking; assembly loads must be included in the stress budget of PC parts at the design stage;After confirming effectiveness, solidify the parameters and practices into the work instruction to prevent recurrence
War das hilfreich?
0 Personen fanden dies hilfreich
Vielen Dank für Ihr Feedback!