Menu
Materiais Máquinas
Perspetivas
Artigos Vídeos Problema e solução
About
Sobre a Chembull Parceiros de média
Contacte-nos
Idioma
EnglishالعربيةPortuguêsEspañolDeutschTürkçe한국어
Voltar a Problema e solução
Molds & Tooling 8 visualizações

PPO Melt Fracture

Fenómeno do problema
During high-speed filling of PPO, melt fracture patterns appear on the product surface; reducing speed leads to insufficient filling, and the contradiction is prominent in thin-walled parts.
Análise das causas
The high-viscosity PPO melt has a low critical shear rate, and high-speed filling easily triggers melt fracture; small gates concentrate shear; low temperature increases viscosity and aggravates the fracture tendency.
Solução
①Multi-stage injection with reduced speed in the gate area and increased speed in the filling area; ②enlarge the gate to reduce shear rate; ③increase melt temperature to reduce viscosity; ④switch to a high-flow grade if necessary.
Conclusão principal
The contradiction between PPO melt fracture and insufficient filling is resolved by multi-stage injection; gate size is a structural solution; high-flow grades are a material-level way out.; After confirming effectiveness, fix the parameters and practices into the work instruction to prevent recurrence
PPO; melt fracture; shear; multi-stage injection; gate; thin wall

Isto foi útil?

0 pessoas acharam isto útil

ChemAI