Blow Molding
3 Aufrufe
AEPDS '2079851475616104457
Problembeschreibung
AEPDS '2079851475616104457 parison and product, melt strength management.
Ursachenanalyse
AEPDS '2079851475616104457; melt strength; parison quality; blowing process; wall thickness control; performance verification.; During on-site troubleshooting, verify item by item according to this mechanism, and avoid blindly adjusting the machine based only on experience
Lösung
①Melt strength; ②parison process; ③blowing optimization; ④wall thickness control; ⑤performance test.; After adjustment, continuously sample to verify the effect, and resume mass production only after confirming stability
Wichtigste Erkenntnis
Melt strength is the process key of AEPDS '2079851475616104457; parison is the foundation; testing ensures quality.; After confirming effectiveness, fix the parameters and practices into the work instruction to prevent recurrence
War das hilfreich?
0 Personen fanden dies hilfreich
Vielen Dank für Ihr Feedback!