Menü
Materialien Maschinen
Einblicke
Artikel Videos Problem & Lösung
About
Über Chembull Medienpartner
Kontaktieren Sie uns
Sprache
EnglishالعربيةPortuguêsEspañolDeutschTürkçe한국어
Zurück zu Problem & Lösung
Molds & Tooling 3 Aufrufe

Product cooling time too long and low production efficiency

Problembeschreibung
Cooling time accounts for more than 75% of the molding cycle
Ursachenanalyse
Mold cooling water channel design is unreasonable and cooling efficiency is low; the material has large crystallization heat and needs longer heat dissipation time; demolding temperature requirements are strict
Lösung
Optimize cooling water channel layout and water flow parameters; adopt rapid heating and cooling (RHCM) technology; use high thermal conductivity mold materials (such as beryllium copper inserts)
Wichtigste Erkenntnis
Shortening cooling time is the most direct way to improve production efficiency
cooling timeproduction cycleRHCMberyllium copperwater channel optimization

War das hilfreich?

0 Personen fanden dies hilfreich

ChemAI